Auction results

Auction Date Start of the storage period End of the storage period Sold WGV (m3 /MWh) Auction price
24.3.2020 1.5.2020 1.4.2021 267 000 MWh 8.50 CZK/MWh/month
30.7.2020 1.8.2020 1.4.2021 213 000 MWh 14.48 CZK/MWh/month
23.9.2020 1.10.2020 1.4.2021 0 MWh 8.50 CZK/MWh/month
30.9.2020 1.10.2020 1.4.2021 107 000 MWh 3.45 CZK/MWh/month
30.3.2021 1.4.2021 1.4.2022 179 440 MWh 38 CZK/MWh
9.12.2021 1.4.2022 1.4.2023 179 440 MWh 44 CZK/MWh
11.8.2022 day after the signature of storage agreement 1.4.2023 0 MWh 0 CZK/MWh
8.9.2022 day after the signature of storage agreement 1.4.2023 120 032.975 MWh 0 CZK/MWh
11.10.2022 day after the signature of storage agreement 1.4.2023 0 MWh 0 CZK/MWh
9.11.2022 day after the signature of storage agreement 1.4.2023 3 641 333.712 MWh 0 CZK/MWh
11.11.2022 1.4.2023 1.4.2024 479 360 MWh 10.28 CZK/MWh/month
16.2.2023 1.4.2023 1.4.2024 4 314 240 MWh 6.94 EUR/MWh